Skip to main content

Smart R&D, smart factories, smart supply chain

The GEO global ecosystem represents an entire end-to-end circular economy solution for the transition to green energy.

GEO global footprint

Your browser does not support SVG

Innovation when and where its most effective

We continuously upgrade our offerings to ensure more competitive prices, better product performance and logistics efficiency. Our innovations are informed by local R&D centers with rapid testing facilities.

50%+

Employees holding a master’s degree or higher

13,000+

Number of battery testing channels

2 days

Average sample delivery time

APAC

GEO Asia Pacific R&D center

R&D Center: 20,000m²

  • Battery Assembly
  • Performance Test Lab
  • Integrated Synthesis Lab
  • Pilot Plant

APAC electrolyte sample lab

Czech electrolyte sample lab

Synthesis and analysis capabilities

Unmanned QC Lab

Battery assembly and test line

Next-generation, highly automated
gigafactories

Our strategically located gigafactory capacity will feature advanced high-speed automated production lines for exceptional efficiency, quality and safety.

GEO gigafactory electrolyte capacity

Total

1.2 mil

tons

Europe

400K

tons

US

800K

tons

Operationalised in under one year

Our deep experience, strong execution ability and collaborative partnerships allow exceptionally fast development.

Compared to industry averages

+45%

higher automation

+50%

ramp up

75%

less staff needed

Integrated approach

  • Vertical value chain, optimized for circularity
  • Globally networked for knowledge sharing
  • Lean management and high automation

Strategic locations

  • Manufacturing within 500km of key customers
  • Smart, agile supply chain with JIT service model

Localized warehousing

  • Within 50km of customer’s factory
  • 1000+ storage capacity
  • 4 to 6-hour delivery
  • Plug-in refrigeration capacity
  • Tank cleaning

Automatic Loading and Unloading

Fully automated filling

Fully automated logistics

GPS real-time tracking and container sensors monitor

EU

The first Czech GEO gigafactory serves Europe

  • Largest single-unit capacity in the western world
  • Highly automated for maximum efficiency and reduced costs
  • Industry-leading product and service quality
  • Rapid local service response within 4 to 6 hours
  • Compliant with the highest international ESG & EHS standards

Electrolyte

200kt

CNT slurry

50kt

NMP
purification

50kt

Czech plant: GEO breakthrough efficiency

SOP time

2024-05

Lab sample

2024-10

Pilot time

2025-02

Mass production

The Texas GEO gigafactory serves North America

This GEO gigafactory will provide essential components for EV manufacturers in the USA:

  • Location: USA (Houston, Texas)
  • Production capacity (Phase 1):
    100kt/y (Electrolyte) + 50kt/y (NMP & CNT Slurry)
  • Commissioning time: Q1, 2026

USA

Approval of Air Permit for the US Project

6 to 12 months

Industry average

19 days

for air permit approval